A large software company was in the process of expanding its data center presence in the Midwestern United States. With the pandemic increasing reliance on data storage and processes, this company was anxious to move on this project despite product delays and pandemic-related labor and material shortages.
Challenge
The biggest challenge for this customer was time. They had set a project schedule and needed to strictly adhere to it.
The global PVC shortage added another wrinkle. This customer could not succumb to product delays. Additionally, the pandemic was causing labor shortages as businesses closed or slowed in an attempt to keep their workforces safe and stop the spread of COVID-19.
Solution
The project owners studied fiberglass conduit and noted its low coefficient of friction for smooth cable pulling, fault resistance for easy cable replacement and of course no burn-through on elbows, eliminating repairs caused by repetitive grooving or piercing. The speedy installation also appealed to the customer, because Champion FiberglassⓇ conduit offered lower NECA man-hour rates compared to PVC.
Fiberglass elbows are the standard for data center projects, but fiberglass straight sections are not used as often as other conduit types. Typically, PVC conduit straight sections in combination with fiberglass elbows are used for data center projects. But supply issues with PVC have prompted electrical engineers and contractors to entertain alternatives in order to keep projects on track. That is exactly what happened on this data center project.
Results
After careful consideration, the customer settled on fiberglass elbows and straight lengths for the entire job. One of the biggest wins for this project was installation. The contractor was able to install three miles of conduit in underground duct banks in one day. Thanks to our unique gasketed connection conduit that requires no adhesive to connect the straight lengths and elbows, the installation took half the time as the same installation with PVC conduit.
Meeting project deadlines was another win. This project required carefully orchestrated collaboration between the Champion Fiberglass team for production and delivery and the electrical contractor for receiving and installation. There were multiple deliveries every week throughout the duration of the project and on-time deadlines were met.
In addition to the project benefiting from fiberglass conduit’s low coefficient of friction, no burn-through and fault resistance, this customer benefited from product availability, lower prices, fast installation and the ability to stay on schedule to hit milestones. They also benefited from Champion Fiberglass’ 30+ years of project expertise to guide solutions.
Key factors for success
- Low coefficient of friction, no burn-through and fault resistance provided ultimate protection for important data center electrical.
- Fiberglass conduit served as a reliable substitute for PVC throughout a product shortage.
- Fiberglass conduit saved materials costs over rising PVC prices.
- On-time deliveries and speedy installation allowed the project to finish on time to hit goals.