Keep It Simple, Stupid: Things they did not teach me in school, part 3

By Stephen Carr | Nov 17, 2026
AdobeStock_167253545
This month, I am going to cover what I have learned, and am still learning, about organization.

Advertisement

Advertisement

Advertisement

Advertisement

Advertisement

This month, I am going to cover what I have learned, and am still learning, about organization. The electrical construction industry is changing rapidly, and so are the projects and the way they are represented on the bid documents. I had to learn to evolve at the same speed to keep up with those changes. 


It’s not cast in concrete

I had to learn an important lesson the hard way, and I want you to learn it the easy way: do not become rigid. This applies to the way you organize your estimates. This also works for how you organize your time. However, since this article is more about estimating, let’s stick with organizing estimates for now.

I was not given much in the way of guidelines for organization when I was a trainee estimator. There were a couple of requirements, such as getting the fixtures counted first so we could send the quantities out for quotation. The organization of my estimate reports came from the computer system we were using (Estimatic). I was told what to count and measure, but the order in which I did my takeoff was up to me.

I was also taught to completely mark off each item I counted with a highlighter. This was my first lesson in being consistent, as there were only four highlighter colors to choose from at that time. I had to decide which color to use for each type of takeoff. I figured out for myself that being consistent by using the same colors every time was the best way to go. I ended up with yellow for fixtures, green for devices and outlets, hot pink for switchgear and equipment, and blue for other things, including connections. I also used a soft orange artist’s pencil for conduit and wire. There are many colors available now, in physical and on-screen highlighters, although I have found there are only so many shades of each color I can easily tell apart. 


Visual cues

It did not take long to figure out from observations that I needed to change the order in which I did my takeoffs. I found that while measuring branch, it was easier to see all of the fixtures and outlets if they were already highlighted. It also made finding uncounted fixtures and outlets easier. 

That, however, was during the time when engineers actually engineered the branch circuits. Following the lines of branch circuits always led me to the items I missed while counting. Without those lines, I have to be a little more careful while counting, which, of course, takes a little more time. My advice: count the fixtures and outlets first.


Increasing complexity 

I was started on a steady diet of very simple projects as a trainee estimator. In the early 1980s, I believe many things about projects were less complex than they are today. For example, most buildings did not have a lot of intricate systems. Sure, fire alarm systems could become complicated simply because of the number of wires they required, and a moderately-sized building could have a backbone with more than 100 wires in it. 

Otherwise, the majority of projects were simple. They had fixtures, outlets and branch circuits, with a little bit of switchgear and feeders. Most of my work was small commercial projects, including strip malls and bank branches. 

Eventually, my boss started to give me more complex projects to bid, which required me to become more organized. For the first time, I actually had to accommodate multiple bid items, a mix of ceiling heights and types, and a lighting control system, all on one project. It was time to step up my organization and learn about materials I had never heard of before. 

The acronym KISS, meaning “keep it simple, stupid,” came into play. While the “stupid” part is a little insulting, I understand why it is there. It could be considered stupid to let things get too complex. I took the saying to heart and learned to break complex problems down into multiple, small, easily accomplished tasks. Organizing my estimating this way relieved a lot of stress, as I was spending less time wondering how to get something done. Instead, I could launch myself right into getting the takeoff started. It does not matter how big a project is, it still breaks down into smaller, more easily accomplished tasks.

An easy way to accomplish the KISS goal is to do your estimates the same way every time. I learned to create a checklist of the order in which to perform tasks. Eventually, it became automatic. Once I received the bid documents, I launched into the checklist process. Staying organized and being consistent in my methods paid off, with fewer errors and faster project completions. 

stock.adobe.com/gustavofrazao

About The Author

CARR has been in the electrical construction business since 1971. He started Carr Consulting Services—which provides electrical estimating and educational services—in 1994. Contact him at 805.523.1575 or [email protected], and read his blog at electricalestimator.wordpress.com.