October Issue 2002

 


Sort by
| October 2002
210.52(C)(5) Receptacle Outlet Location Provisions stipulating the placement of receptacle outlets are covered in 210.52 through 210.63.

| October 2002
In the electrical contracting industry, material ordering and delivery are critical to the successful execution and completion of any project.

| October 2002
In June 1978, at a South Carolina resort, a young woman wearing only a bathing suit was observed in the early evening stepping into an illuminated water fountain.

| October 2002
Using design-build as a project delivery method allows the electrical contractor to provide early input into the construction process and gives the contractor more influence o

By
| October 2002
A load or circuit with significant loads that have rectified inputs will most likely have a true power factor (W/VA) that is less than displacement power factor (cosine of ang

Pages