July 2013: Green Construction Special Report

 

Lighting and control technology advances and creative daylighting implementation 
are propelling green lighting practices. ECs...

We have seen it before in the movies—machines so smart they start to talk to...

Energy-efficiency-based renovations are surging ahead of new construction lately as legislation and the sheer cost...

When you think about it, today’s electrical contractor (EC) is an energy-efficiency adviser. It may...

Market action


In a growing world of green building, energy-efficient design and sustainability, you might assume the...

“Net-zero energy” 
is the new “LEED-certified” 
when it comes to environmental boasting rights for commercial-building...

Though utility rebates on energy-efficient electrical products have waxed and waned during the past 20...

The new Zero Net Energy Center in San Leandro, Calif. Credit: Chad Ziemendorf

You can’t create something out of nothing, but the Northern California Chapter, NECA and IBEW...


Sort by
| July 2013
The first step in conducting an arc flash study is to obtain the data necessary to accurately represent the electrical system.

, , , , , , , ,
| July 2013
When you think about it, today’s electrical contractor (EC) is an energy-efficiency adviser. It may be a matter of reinvention, but it’s a logical destination.

| July 2013
Energy-efficiency-based renovations are surging ahead of new construction lately as legislation and the sheer cost of energy encourage building owners to find ways to slash po

| July 2013
I was involved recently in a discussion on lightning protection for various types of buildings and what standards applied to those installations or if the installations requir

| July 2013
An electrical contractor, let’s call him Sparky Inc., was running into financial difficulty.

Pages