July 2011: Control Systems

 

“VPP” is the latest electricity-system-of-the-future phrase in the expanding smart-grid lexicon.

Do your customers prefer a traditional or converged approach to their building automation infrastruc


Sort by
July 2011
Five years after completing the 500-megawatt (MW) Astoria Energy natural gas combined-cycle power plant in Queens, N.Y., E-J Electric Installation Co. READ MORE
July 2011
Home automation is where the worlds of information technology (IT) professionals and electrical contractors come together. READ MORE
By
July 2011
As part of the Obama administration’s SunShot Initiative to make solar energy cost-competitive with fossil fuels within the decade, U.S. READ MORE
By
July 2011
A recent analysis by corporate and utility consulting firm E Source reveals a strong interest among residential customers in smart meter data. READ MORE
July 2011
Two different instruments that are often described as “works like radar” can test copper and fiber cabling. For copper, it is a time-domain reflectometer (TDR). READ MORE

Pages

July 2011