American Electric Power’s (AEP) 765-kilovolt (kV) joint transmission line proposal with Allegheny Energy Inc was approved by PJM Interconnection (PJM) of Norristown, Pa. READ MORE
© 2003 - 2012. All Rights Reserved.
Electrical Contractor: 3 Bethesda Metro Center, Suite 1100, Bethesda, MD. 20814-5372 | Phone: 301.657.3110 | Fax: 301.215.4501