August 2013: BIM, D/B and IPD

 

Monitoring-based commissioning (MBCx) may not be a popularly known practice in the building community right...

Electrical contractors’ participation in design/build (D/B) projects continues to increase annually, with 36 percent of...

A select audience of industry practitioners and university researchers recently gathered in Kansas City, Mo.,...

Contractors have been using rudimentary building-information modeling (BIM) tools since the 1970s to design installations...

As we enter the fall, crops are ready for harvest, the leaves on trees are...

Who wants to be without lights, heat, air conditioning or a working refrigerator? Try asking...

In 2009, the General Services Administration (GSA), which delivers federal workplaces, turned its attention to...

Drill driver holster from Joseph Hofer Jr.

Every month, Jack Pullizzi picks the top four Ideas That Work submitted by you, ELECTRICAL...


Sort by
| August 2013
Recently, I was training a group of instructors and heard a complaint that I had heard before from another Fiber Optic Association (FOA) training organization.

| August 2013
Every electrical project is fraught with danger and risk.

| August 2013
Here is some promising news for electrical contractors and the entire industry: a study by the Rexel Foundation found that American consumers are driving the adoption of energ

3,000A clamp-on CT, Rogowski coil or flex probe, Hall-effect current probe
| August 2013
Debates within the organizations that develop the power quality standards will probably continue for years about why “power” isn’t really the subject of the standards.

| August 2013
In June 2008, a four-person crew began work to upgrade existing 7,200-volt (V) power lines by installing new 15-kilovolt (kV) switches and removing the old switches.

Pages

X