Electrical Contractor Magazine

August 2011: The Rise of Prefabrication

 

It may be energy auditing. It may be retrocommissioning. It may be recertifying a green building.

Industry experts say modular building technologies—which allow for the prefabrication of modules in


Sort by
August 2011
If you have a problem related to the National Electrical Code (NEC), are experiencing difficulty in understanding a Code requirement, or are wondering why or if such a requir READ MORE
August 2011
If success of the nationwide movement toward a more modernized electricity transmission system is measured by the number of smart meters installed, then, by recent accounts, READ MORE
August 2011
Whether conductors are supplying power to branch circuits, feeders or services, the ampacity must not be less than the load. READ MORE
By
August 2011
The application window for ­Florida Power & Light (FPL) Co.’s 2011 solar photovoltaic (PV) rebate program closed after 310 FPL customers applied for approximately $5.6 mi READ MORE
August 2011
While the economy seems to be fragile and teetering, political leaders and economic strategists fear one wrong move could bring it all down in pieces. READ MORE

Pages

August 2011