August 2010: Design/Build

 

Integrated project delivery (IPD) is defined by the American Institute of Architects (AIA) in its 20

Standard 189.1, the Standard for the Design of High-Performance, Green Buildings Except Low-Rise Res

(Editor's Note: This article is a follow-up to Joe Kelly's full profile report in the July issue.

Last month’s column used the BP oil spill as an example of the risk associated with a “good enough”


Sort by
August 2010
Establishing a common protocol to make it easier for systems to work together is a major goal of the security systems sector. READ MORE
August 2010
A large number of calculation provisions are in the National -Electrical Code (NEC). READ MORE
August 2010
Last month’s column used the BP oil spill as an example of the risk associated with a “good enough” standard. READ MORE
August 2010
The electrical contractor’s role in fiber optic design/build projects is important. READ MORE
August 2010
Too often, when it comes to electrical safety on the job site, it is assumed that the protection is only about electricians or those working around live wires. READ MORE

Pages

August 2010