August 2010: Design/Build

 

Integrated project delivery (IPD) is defined by the American Institute of Architects (AIA)...

Standard 189.1, the Standard for the Design of High-Performance, Green Buildings Except Low-Rise...

(Editor's Note: This article is a follow-up to Joe Kelly's full profile...

Last month’s column used the BP oil spill as an example of the...


Sort by
| August 2010
Integrated project delivery (IPD) is defined by the American Institute of Architects (AIA) in its 2007 “Integrated Project Delivery: A Guide” as a “project delivery approach t

| August 2010
Design/build has evolved into a major electrical construction delivery method.

| August 2010
Testing the loss of an installed fiber optic cable plant involves checking the loss of the fiber itself, plus any splices and terminations added during installation.

| August 2010
Too often, when it comes to electrical safety on the job site, it is assumed that the protection is only about electricians or those working around live wires.

By
| August 2010
Researchers from Delft University of Technology (TU Delft), a public technical university in the Netherlands, have shown how the energy yield of relatively cheap solar panels

Pages

X