Codes & Standards

 

Essential to the work of the electrical contractor is knowledge of the National Electrical Code, the National Electrical Installation Standards and additional standards and codes administered by the National Fire Protection Association, the Occupational Safety and Health Administration and others. Here is a list of all our articles on codes and standards listed chronologically by issue date. 

Jim Dollard has an extensive background in codes and standards. If you have a query about the National Electrical Code (NEC), Jim will help you solve it. Questions can be sent to codefaqs@gmail.com. Answers are based on the 2014 NEC.
 Pull-through angle connectors?


Some photovoltaic (PV) inverter manufacturers have designed and built transformer-less inverters to add to their existing line of transformer-type inverters for installation in the United States. Transformer-less inverters have been popular in Europe for quite some time.

Article 430 of the National Electrical Code (NEC) covers motors, motor branch-circuit and feeder conductors, motor branch-circuit and feeder protection, motor-overload protection, motor-control circuits, motor controllers, and motor-control centers.

During a recent National Electrical Code (NEC) training program, inquiries about ground-fault protection of equipment (GFPE) were raised.

More on Codes & Standards

 
Vampires, Phantoms and Energy Hogs

At a recent National Electrical Code (NEC) update seminar, 
I was asked about the new requirements to install a grounded (neutral) conductor in a box for switches that control lighting loads.

READ MORE
 
Stay Dry

I made a comment while teaching a class that nonmetallic (NM) cable was not permitted in an outdoor, wet location. An attendee took exception to that statement and asked me to provide National Electrical Code (NEC) justification for the assertion.

READ MORE
 
Equipment Or Building?

At some properties, a single electric utility service supplies multiple buildings or structures. The service could directly supply one of the buildings, and feeders or branch circuits supply other buildings from that service equipment.

READ MORE
 
Reliability Of Service, Lockable Disconnect And More

Editor’s note: Jim Dollard is our new Code FAQs columnist. While he has big shoes to fill after Charlie Trout’s retirement, he has an extensive background in codes and standards. He also has a new email address for you to send in your questions: codefaqs@gmail.com.


READ MORE
 
Sizing Conductors, Part XXXII
by Staff |

With a lot of work from many dedicated individuals, the 2014 edition of the National Electrical Code (NEC) became available at the end of August 2013. The Code is revised every three years, but the revision cycle has not always been three years. Revision cycles have ranged from one to four years. 


READ MORE
 
The Best Of Code Question Of The Day, Part III

Charlie Trout, author of Code FAQs and Code Question of the Day, has retired. Enjoy these highlights from his past responses. Sealing conduit that passes into refrigerated room


READ MORE
 
Sizing Conductors, Part XXXI

Tap conductor rules are located in Article 240 in the National Electrical Code (NEC). A tap conductor (as used in Article 240) has overcurrent protection ahead of its point of supply that exceeds the value permitted for similar conductors that are protected as described elsewhere in 240.4 [240.2].

READ MORE

Pages